Kits built to your component list, reconciled on every run.

A kit is only as good as the weakest component date in it. Ours are built against a controlled component list, with expiry tracked at the component level so a kit never ships shorter-dated than the study needs.

What we build

  • Specimen collection kits
  • Diagnostic and IVD kits
  • Protocol-specific and visit-specific study kits
  • Blinded and unblinded builds
  • Return kits and pre-paid return packaging
  • Ancillary and consumable kits for sites

How we build it

  • Controlled component list, versioned and approved before the first build
  • Component-level lot and expiry capture, so kit dating is driven by the shortest component
  • Insert, IFU and documentation assembly
  • Secondary packaging, bundling, pouching and cartoning
  • Tamper-evident sealing
  • Reconciliation on every run — built, passed, rejected, scrapped
  • Kit inventory held by us, with site replenishment on your trigger

The part nobody costs correctly

Kit programmes fail on the second build, not the first. Component lead times drift, a supplier changes a part number, a protocol amendment lands. We hold your component inventory and flag short-dated and short-stocked components before they become an emergency, which is the difference between a phone call and a study delay.

Tell us what you need to move, and at what temperature.

Send us the materials, the temperatures and the destinations. We will come back with a scope and a price — not a discovery call.