Kits built to your component list, reconciled on every run.
A kit is only as good as the weakest component date in it. Ours are built against a controlled component list, with expiry tracked at the component level so a kit never ships shorter-dated than the study needs.
What we build
- Specimen collection kits
- Diagnostic and IVD kits
- Protocol-specific and visit-specific study kits
- Blinded and unblinded builds
- Return kits and pre-paid return packaging
- Ancillary and consumable kits for sites
How we build it
- Controlled component list, versioned and approved before the first build
- Component-level lot and expiry capture, so kit dating is driven by the shortest component
- Insert, IFU and documentation assembly
- Secondary packaging, bundling, pouching and cartoning
- Tamper-evident sealing
- Reconciliation on every run — built, passed, rejected, scrapped
- Kit inventory held by us, with site replenishment on your trigger
The part nobody costs correctly
Kit programmes fail on the second build, not the first. Component lead times drift, a supplier changes a part number, a protocol amendment lands. We hold your component inventory and flag short-dated and short-stocked components before they become an emergency, which is the difference between a phone call and a study delay.
Tell us what you need to move, and at what temperature.
Send us the materials, the temperatures and the destinations. We will come back with a scope and a price — not a discovery call.